A
B
- Back-Injection Protocol
- Bark Borer Beetle
- Basement Heritage Factors in the Context of Damp Proofing
- Basements
- Bitumen or Cement Tanking Prohibited in Lime-Built Walls
- Bitumen Paint
- Bitumen Tanking
- Black Mould
- Blistering Plaster
- Boarded with Batten or Dabs
- Borate Rods
- Bore Dust – Frass
- Borescope
- Boron-Based Preservative
- Breathability Compatibility Table
- Breathability-First Materials Policy – Walls Must Dry Both Ways
- Breathability Misalignment – Lime vs Gypsum
- Breathable Plaster
- Breathable System Requirement
- Breathable Systems
- Brick Walls
- Bridged Cavity Insulation
- Bridged Damp Proof Course – DPC
- Bridged DPC Post-Treatment
- Bridging by External Render or Soil
- Bridging by Internal Plaster – Not Cut Back
- Bridging Damp
- Bridging from Internal Plaster
- Brown Rot
- BS 5250 – Moisture Management
- BS 6576 – Chemical DPC
- BS 8102 – Basement Waterproofing
- BS EN 998-1 EN 13914 EN 1504-2
- Building Regulations Part C
- Building Regulations Part F – Ventilation
- Building Regulations Part L – Thermal Bridging
C
- Capillary Absorption Rate
- Capillary Action
- Capillary Action Testing
- Capillary Break Layer
- Capillary Rise Rate
- Causes of Damp
- Cavity Drain Membrane – CDM
- Cavity Drain Membranes
- Cavity Drainage with Sump Pump
- Cavity Wall Properties
- Cementitious Coatings
- Chemical Damp Proof Course – DPC Injection
- Chemical DPC Injection
- Client Blocked Vents Post-Install
- Client Testimonials
- Cold Bridge Damp
- Cold Bridge-Induced Rot
- Cold Walls
- Common Furniture Beetle – Anobium punctatum
- Compatibility Matrix – Old Wall vs Modern Treatment
- Concrete Structures
- Condensation Control via Passive Stack or PIV – No MVHR in Single-Room Retrofits
- Condensation Damp
- Conservation Officer Review Points
- Construction Defects
- Consumer Rights Act 2015
- Contractors – Joiners
- Cracked Walls
- Cream Injected with Back-Pressure
- Cryogenic Chambers
- Cure Time Observed – 7-14 Days
- Curing Period – 3-7 Days
- Customer and Business Aspects
D
- Damp Conflict with Thermal Efficiency
- Damp Inspection Report – Formal Diagnosis
- Damp Patches
- Damp Proof Paint
- Data Logger with Dew Point Tracking
- Deathwatch Beetle – Xestobium rufovillosum
- Defective Premises Act 1972
- Defective Roof
- Dew Point
- Dew Point Calculator
- Dew Point Threshold
- Diagnosis Report
- Discolouration
- Disrepair Bundle Evidence
- Disruption Preparation
- Donkioporia expansa – Historic Buildings
- DPC Cream – Silane and Siloxane
- DPC Creams
- Drain Channel and Sump Pump Installed
- Drainage Systems
- Drill Bits
- Drill Pattern Marked and Spaced
- Drill Sampling
- Dry Rot
- Dry Rot – Serpula lacrymans
- Drying Curve Report – RH Over Time
- Drying Curve Reports
- Duty of Care
E
- Electro-Osmotic DPC
- Energy Inefficiency
- Enquiry Process
- Environmental Protection Act 1990
- Epoxy Resins
- Estate Agents
- Exit Holes
- Expert Witness Damp Report
- External Damp
- External Insulation
- External Render Damage
- External Render Must Be Lime or Vapour-Open
- External Render Types – Lime
- External Repairs – Render
- External Waterproofing
- Extractor Fans
F
G
H
- Heritage Retrofit
- Heritage-Safe Low-Toxicity Methods
- HHSRS Hazard Category Scoring
- High Moisture – greater than 20 percent
- High Moisture Meter Readings
- High Water Table
- Historic Buildings
- Homeowners
- Homes – Fitness for Human Habitation Act 2018
- House Longhorn Beetle – Hylotrupes bajulus
- Housing Act 2004
- Housing Associations
- Housing Health and Safety Rating System – HHSRS
- Hydrostatic Pressure
- Hygrometer
- Hygrometer Placement
- Hygrometers
- Hygroscopic Damp
- Hygroscopic Salt Behaviour
- Hygroscopic Salt Neutralizers
- Hygroscopic Salts
I
- Impermeable Surface Layer Trap
- Inadequate Tanking Bond – Poor Substrate Prep
- Infrared Thermography
- Injection Depth Verified per Substrate
- Injection Guns
- Injection into Holes
- Inspection and Diagnosis
- Insufficient Injection Depth
- Insurance Clauses
- Internal Damp
- Internal Insulation Requires Risk Path Assessment – PAS2035
- Internal Wall Insulation
- Internal Wall Insulation Constraints
- Internal Waterproofing
- Interstitial Condensation
- Interstitial Condensation Risk
- ISO 9001 – Quality Management
L
- Landlord and Tenant Act 1985
- Landlords
- Larval Stage Lifecycle
- Lateral Damp
- Lateral Penetration
- Leaking Pipes
- Legal Claim Submission – Via Solicitor or Council
- Letting Agents
- Lime Plaster
- Lime Plaster Reinstatement Required Post-Diagnosis
- Listed Building Consent
- Listed Buildings
- Local Councils
- Local Reputation
- Low-Impact DPC Options
M
- Materials and Products
- Membrane Puncture During Second-Fix
- Mesh Reinforcement at Weak Zones
- Microporous Barrier Films
- Misaligned DPC Injection Height
- Misapplied Render over Tanking
- Misdiagnosed Condensation
- Misreading Moisture Meters on Painted Walls
- Missing DPC or Faulty Installation
- Mixing Paddles
- Moisture Buffering Capacity
- Moisture Gradient Mapping
- Moisture Meter
- Moisture Meter Baseline Logging
- Moisture Meter Readings Sheet
- Moisture Meters
- Moisture Retentivity Index
- Moisture Sensor Logging
- Mortgage Survey Compliance
- Mould and Health Risks
- Musty Smell
N
P
- Party Wall Act 1996
- Party Walls
- PAS 2035 Heritage Risk Pathways
- PAS 2035 – Retrofit Specification
- PAS 2035 Risk Pathway
- Passive Hygrometer – Manual Read
- Passive Vents
- Payment Plans
- PCA Code of Practice
- Peeling Paint or Wallpaper
- Penetrating Damp
- Permethrin-Based Insecticide
- Photographic Evidence Log
- Physical Damp Proof Course
- PIV Unit Installed in Loft with Insufficient Airflow Path
- Plaster Applied Over Tanking with Bonding Key
- Plasterboard
- Plastering Tools
- Plastering with Waterproof Additives
- Plumbing Issues
- Plumbing Leak Damp
- Poor Overlap Between Cavity Membrane and Skirting Detail
- Poor Ventilation
- Positive Input Ventilation – PIV
- Post-Treatment Care & Monitoring
- Post-Treatment Salt Bloom Check
- Powderpost Beetle – Lyctus brunneus
- PPE – Personal Protective Equipment
- Prohibited Treatments – Bitumen
- Property Valuation Impact
- Public Health Acts – 1936
R
- Re-Entry Schedule Based on WME
- Re-Treatment Over Incompatible Substrates
- Rebuilding of Structural Joists
- Regulations and Compliance
- Relative Humidity
- Renters Reform Bill – Pending
- Repainting Before Full Dry-Down
- Repainting Too Soon
- Replaster Monitoring & Breathability
- Replastering Systems
- Replastering with Breathable System Only
- Resin Repair and Strengthening
- Retrofit Coordinators – PAS 2035
- Retrofitted Dwellings
- RH-to-Dew Point Conversion
- Rising Damp
- Risk of Rebridging Surface Sealing
- Rotting Skirting Boards
S
- Salt Bloom Recurrence Test
- Salt-Inhibitor
- Salt Rebound Due to Untreated Contamination
- Salt Retention Index
- Salt Staining Efflorescence
- Salt Test Kits
- Scrapers
- Sealant Application
- Sealant Applicators
- Section 11 Enforcement Summary
- Silicone Sealer
- Site Visit
- Skipped Salt-Neutraliser
- Skipping Salt Neutraliser
- Skirting and Flooring Refitted
- Smart Ventilation Feedback System
- Soft Rot
- Solid Wall Properties
- Specialist Surveyor
- Statutory Nuisance Letter Template
- Statutory Nuisance Orders
- Stone Walls
- Structural Damage
- Structural Softness
- Structural Timber Must Be Rot-Assessed
- Studded Membrane Applied with Sealed Fixings
- Subsidence
- Substrate Cleaned and Checked
- Substrate Identification
- Substrate Porosity Mapping
- Subterranean Pressure Damp
- Surface Porosity Diagnostics
- Surface Powdering
- Survey-Ready Positioning
- Surveyor Report Protocol
- Surveyors
- Symptoms of Damp
T
- Tanking
- Tanking Failure at Terminations Junctions
- Tanking Failure from Improper Key
- Tanking Slurry
- Tanking Slurry Application
- Tenant Complaint Timeline
- Tenant Rights
- Tenants
- Thermal Bridging
- Thermal Cameras
- Thermal Conductivity vs Moisture Retention
- Thermal Imaging
- Thermal Imaging Follow-Up
- Thermal Mass Effect – Stone vs Brick
- Thermal Treatment
- Thermal Treatment Equipment
- Timber Contact with Masonry
- Timber Frame Homes
- Timber Removal Replacement
- Timber Replacement
- Tools and Equipment
- Trapped Moisture Behind Foil-Backed Boards
- Treatment Methods
- Treatment Timeline
- TrustMark Accreditation
- TrustMark Retrofit Coherence
- Types of Damp
U
V
W
- Wall Prep – Loose Debris and Paint Removed
- Wall Preparation – Paint – Plaster Removed to 1.2m
- Warranty Maintenance Steps
- Warranty Moisture Threshold Checkpoint
- Warranty Options
- Water Table
- Waterproof Membranes
- Wet Rot
- Wet Rot – Coniophora puteana
- Wharf Borer – Nacerdes melanura
- White Rot
- Winter Risk Messaging
- Wireless Moisture Sensor Logger
- Wood Boring Weevil – Pentarthrum huttoni
- Wood Rot Management
- Wood Rot Types
- Woodworm